Serverius colocation infrastructure overview

Redundant power, buildings above sea level, connected to the best possible power grid in the Netherlands, offers users the safest colocation environment in Europe.

Company structurePrivately owned (without investors) for more than 15 years.
Financial healthy company for more than 3 years:
CertificationISO 27001 and ISO 9001
Access time by users24 hours a day independent client access by personal card + fingerprint + personal pin code.
Amount of colocation cabinets500+
Datacenter construction company:


“We believe it is our responsibility to our users and to ourselves to offer the best possible colocation environment. Our technical colocation infrastructure enables our users to host their own cloud infrastructure.”

SDC1

SDC2

Address

Address: De Linge 26, 8253PJ, Dronten
(The Netherlands)
Chamber of commerce: 34367179

Address: Ketelskamp 10, 7942KG, Meppel
(The Netherlands)
Chamber of commerce DC2: 34315189

Maximum floor load:1.500kg per cabinet1.500kg per cabinet
Type of construction:Steel and concrete constructed
building with box-in-Box datacenter.
Steel and concrete constructed
100% build as datacenter building.
MonitoringBuilding management system and customer support 24×7×365Building management system and customer support 24×7×365
Fire detection systemHSSD and optical smoke sensorsHSSD and optical smoke sensors
Fire suppression systems• FirePro®/IG55
• 60 minute fire-resistant walls
• Portable CO² & Foam extinguishers
• FirePro®/IG55
• 60 minute fire-resistant walls
• Portable CO² & Foam extinguishers
Perimeter fence:250 cm high (front and back) with electrical security wires.250 cm high (front and back) with electrical security wires.
Area:Central Netherlands, ground below Sea level.Central Netherlands, ground above Sea level.
Accessibility:To Serverius datacenter 2: 50km
To German border: 53km
To Schiphol Airport: 80KM
To train station Dronten: 1 km
To Serverius datacenter 1: 50km
To German border: 70km
To Schiphol Airport: 140KM
To train station Meppel: 2 km
Fiber connectivity:Single British telecom, redundant Eurofiber/Unet, Relined. Total of 240 dark fibers.Redundant British telecom, redundant KPN, redundant Relined. Total of 360 dark fibers.
Parking:10 private paring spots within electrical fence, more at the public space.30 private paring spots within electrical fence, more at the public space.
Loading/unloading area:Yes, including overhead doorYes, including overhead door
Meet-Me-Room:Carriers are divided within 3 separate rooms.2 carrier rooms outside the data room.
Carrier neutral:
Coffee room:
Meeting room:
Tier levelBuild as Tier3 with N+1 and 2N powered cabinetsBuild as Tier3 with dual powered N+1 powered cabinets
Datacenter floor space700m21200m2
24 hours a day hardware support. Read moreRead more
High-density (above 6kW): By request.

Power


SDC1

SDC2

Power grid supplier country area:LianderEnexis
Maximum amount of power per cabinet:Full cabinets: up to 2x32Amp (7kW). Third/half cabinets: 1x16Amp.Full cabinets: up to 2x32Amp (10kW). Half cabinets: 2x16Amp.
Power voltage230 volt by NEN 1010 norm230 volt by NEN 1010 norm
Available generator power:905kVa and 450kVa2x700kVa
Generator fuel:Diesel available on site for 96 hours continuous power.Diesel available on site for 96 hours continuous power.
Uptime:99.99%99.999%
Power output:ACAC

Cooling


SDC1

SDC2

Cooling concept:Cold corridorCold corridor
Constant temperature:23°C (+/- 5°C). Higher or lower inlet temperature optional25°C (+/- 5°C). Higher or lower inlet temperature optional
Total cooling capacity:800kW N+1600kW N+1 and growing
Power usage effectiveness (PUE) (last time calculated in January 2017 by external party):1.32 (real load)1.24 (real load)
Cooling redundancy:N+1N+1