Serverius colocation infrastructure overview

Redundant power, buildings above sea level, connected to the best possible power grid in the Netherlands, offers users the safest colocation infrastructure in Europe.

Please visit our datacenters and we show how it’s all done.


“We believe it is our responsibility to offer the best possible environment to
our users and ourselves. That is why the Serverius offers companies the best IT infrastructure possible.

Company structure100% Dutch, privately owned for more than 10 years.
Financial healthy company for more than 5 years:
CertificationISO 9001, ISO 27001, NEN 7510, Official member of the Dutch Datacenter Association
Access time by users24 hours a day independent client access by personal card + fingerprint + personal pin code.
Amount of colocation cabinets500+
Main datacenter infrastructure suppliers:ABB datacenter logo

SDC1

SDC2

Address: De Linge 26, 8253PJ, Dronten
(The Netherlands)
Chamber of commerce: 34367179

Address: Ketelskamp 10, 7942KG, Meppel
(The Netherlands)
Chamber of commerce DC2: 34315189

Maximum floor load:1.500kg per cabinet1.500kg per cabinet
Type of construction:Steel and concrete constructed
building with box-in-Box datacenter.
Steel and concrete constructed
100% build as datacenter building.
MonitoringBuilding management system and customer support 24×7×365Building management system and customer support 24×7×365
Fire detection systemHSSD and optical smoke sensorsHSSD and optical smoke sensors
Fire suppression systems• FirePro®/IG55
• 60 minute fire-resistant walls
• Portable CO² & Foam extinguishers
• FirePro®/IG55
• 60 minute fire-resistant walls
• Portable CO² & Foam extinguishers
Perimeter fence:250 cm high (front and back) with electrical security wires.250 cm high (front and back) with electrical security wires.
Area:Central Netherlands, ground is below sea level, but surrounded by the new Dutch dyke area, safely outside the older Amsterdam dyke area.Central Netherlands, ground is far above sea level in the old stone age area, safely outside the Amsterdam sea area.
Accessibility:To Serverius datacenter 2: 50km
To German border: 53km
To Schiphol Airport: 80KM
To train station Dronten: 1 km
To Serverius datacenter 1: 50km
To German border: 70km
To Schiphol Airport: 140KM
To train station Meppel: 2 km
Fiber connectivity:Single British Telecom, redundant Eurofiber/Unet, Relined. Total of 240 dark fibers.Redundant British Telecom, redundant KPN, redundant Relined. Total of 360 dark fibers.
Parking:15 private paring spots within electrical fence, more at the public space.30 private paring spots within electrical fence, more at the public space.
Loading/unloading area:Yes, including overhead doorYes, including overhead door
Meet-Me-Room:Carriers are divided within 3 separate rooms.2 carrier rooms outside the data room.
Carrier neutral:
Coffee room:
Meeting room:
Tier levelBuild as Tier3 with N+1 and 2N powered cabinetsBuild as Tier3 with N+1 and 2N+1 powered cabinets
Datacenter high density powered floor space1500m21200m2
24 hours a day on-site datacenter client hardware support. Read moreRead more
High-density racks (above 6kW): By request.

Cooling

SDC1

SDC2

Cooling concept:Cold corridorCold corridor
Constant temperature:24°C (+/- 3°C). Higher or lower inlet temperature are optional24°C (+/- 3°C). Higher or lower inlet temperature are optional
Available cooling capacity:800kW N+11400kW N+1
Power usage effectiveness (PUE) (last time calculated in December 2017 by external party):1.32 (real load)1.24 (real load)
Cooling redundancy:N+2N+1

Power

SDC1

SDC2

Power grid supplier country area:LianderEnexis
Maximum amount of power per cabinet:Full cabinets: 1x32Amp by default up to 2x32Amp (7kW). Third/half cabinets: 1x16Amp.Full cabinets: 1x32Amp by default up to 4x32Amp (10kW). Half cabinets: up to 2x16Amp.
Power voltage230 volt by NEN 1010 norm230 volt by NEN 1010 norm
Available generator power:905kVa and 450kVa2x700kVa and 2x800kVa
Generator fuel:Diesel available on site for 96 hours continuous power. (more than 15.000 liters diesel)Diesel available on site for 96 hours continuous power. (more than 20.000 liters diesel)
Uptime guarantee by SLA:99.99%99.999%
Power output:ACAC