Datacenter colocation services
Dutch datacenter colocation, single server colocation, datacenter cages, suite, or private alley with premium connectivity in the Netherlands.
“Redundant power, fire extinguishing systems and cooling which have been reliable for many years. With our known on-site support engineers we offer our clients the best possible datacenter colocation infrastructure environment in Europe.”
Data center company structure | 100% Dutch, privately owned for more than 10 years by the CEO, Gijs van Gemert. |
Financial healthy: | ![]() |
Certification: | ![]() ISO 27001, NEN 7510 |
Access time by users: | 24 hours a day independent client access by personal card + fingerprint + personal pin code via circle lock.![]() |
Amount of colocation cabinets: | 1000+ |
SDC1 | SDC2 | SDC3 | |
Address: De Linge 26, 8253PJ, Dronten ![]() | Address: Ketelskamp 10, 7942KG, Meppel ![]() | Address: Laan van de Ram 39, 7324 BW Apeldoorn ![]() | |
Maximum floor load: | 1.500kg per cabinet | 1.500kg per cabinet | 1.500kg per cabinet |
Type of construction: | Steel and concrete constructed building with box-in-Box datacenter. | Steel and concrete constructed 100% build as datacenter building. | Steel and concrete constructed 100% build as datacenter building. |
Monitoring: | Building management system and customer support 24×7×365 | Building management system and customer support 24×7×365 | Building management system and customer support 24×7×365 |
Fire detection system: | HSSD and optical smoke sensors | HSSD and optical smoke sensors | HSSD and optical smoke sensors |
Fire suppression systems: | • FirePro®/IG55 • 30 minute fire-resistant walls • Portable CO² & Foam extinguishers | • FirePro®/IG55 • 30 minute fire-resistant walls • Portable CO² & Foam extinguishers | • FirePro®/IG55 • 30 minute fire-resistant walls • Portable CO² & Foam extinguishers |
Perimeter fence: | 250 cm high (front and back) with electrical security wires. | 250 cm high (front and back) with electrical security wires. | 250 cm high (back side). |
Area: | Central Netherlands, ground is below sea level, but surrounded by the new Dutch dyke area, safely outside the older Amsterdam dyke area. | Central Netherlands, ground is far above sea level in the old stone age area, safely outside the Amsterdam sea area. | Central Netherlands, 5,6 meter above sea level, safely outside the Amsterdam sea area. |
Accessibility: | To Serverius data center 2: 50km To Serverius datacenter 3: 55km To German border: 53km To Schiphol Airport: 82KM To train station Dronten: 1 km | To Serverius data center 1: 50km To Serverius datacenter 3: 63km To German border: 70km To Schiphol Airport: 140KM To train station Meppel: 2 km | To Serverius data center 1: 55km To Serverius datacenter 2: 65km To German border: 70km To Schiphol Airport: 98KM To train station Apeldoorn: 3 km |
Fiber connectivity: | British Telecom, KPN, Relined, Eurofiber, etc. Total of 360 dark fibers. More you can find here | British Telecom, KPN, Relined, Eurofiber, etc. Total of 360 dark fibers. More you can find here | TrenT, KPN, Relined, Eurofiber, etc. Total of 360 dark fibers. More you can find here |
Parking: | 15 private paring spots within electrical fence, more at the public space. | 30 private paring spots within electrical fence, more at the public space. | 28 private paring spots within electrical fence, more at the public space. |
Loading/unloading area: | Yes, including overhead door | Yes, including overhead door | Yes, including overhead door |
Meet-Me-Room: | Carriers are divided within 3 separate rooms. | 2 carrier rooms outside the data room. | 2 carrier rooms outside the data room. |
Carrier neutral: | ![]() | ![]() | ![]() |
Coffee room: | ![]() | ![]() | ![]() |
Meeting room: | ![]() | ![]() | ![]() |
Tier level: | Build as Tier3 with N+1 and 2N powered cabinets | Build as Tier3 with N+1 and 2N+1 powered cabinets | Build as Tier3 with N+1 and 2N+1 powered cabinets |
Datacenter high density powered floor space: | 1500m2 | 1200m2 | 2400m2 |
24 hours a day on-site datacenter client hardware support: | ![]() | ![]() | ![]() |
High-density racks (above 6kW): | ![]() | ![]() | ![]() |
Cooling | SDC1 | SDC2 | SDC3 |
Cooling concept: | Cold corridor | Cold corridor | Cold corridor |
Constant temperature: | 25°C (+/- 3°C). (indirect free cooling) Higher or lower inlet temperature are optional. | 25°C (+/- 3°C). Higher or lower inlet temperature are optional | 25°C (+/- 3°C) (dry coolers based on indirect free cooling) Higher or lower inlet temperature are optional. |
Available cooling capacity: | Room 1,2,3: 800kW N+2 Room 4: 1000kW N+1 | 1300kW N+2 | 720kW N+1 per data room (3 rooms available) |
Power usage effectiveness (PUE) (last time calculated in December 2017 by external party): | 1.32 (real load) | 1.12 (real load) | 1.18 (real load) |
Cooling redundancy: | N+1 | N+1 | N+1 |
Power | SDC1 | SDC2 | SDC3 |
Power grid supplier country area: | Liander | Enexis | Liander |
Maximum amount of power per cabinet: | Full cabinets: 1x32Amp by default up to 2x32Amp (7kW). Third/half cabinets: 1x16Amp. | Full cabinets: 1x32Amp by default up to 4x32Amp (up to 20kW). Half cabinets: up to 2x16Amp. | Full cabinets: 1x32Amp by default up to 4x32Amp (up to 10kW). |
Power voltage | 230 volt by NEN 1010 norm | 230 volt by NEN 1010 norm | 230 volt by NEN 1010 norm |
Available generator power: | 905kVa, 450kVa, and 3x 2x830kVa | 2x700kVa and 2x830kVa | 2x830kVa per data room |
Generator fuel: | Diesel available on site for 48 hours continuous power. (+/- 25.000 liters diesel) | Diesel available on site for 48 hours continuous power. (20.000 liters diesel) | Diesel available on site for 48 hours continuous power. ( 10.000 liters diesel per data room) |
Uptime guarantee by SLA: | 99.99% | 99.99% | 99.99% |
Power output: | AC | AC | AC |